DESIGN, MANUFACTURE, INSTALLATION, CONSTRUCTION, COMPLETION, COMMISSIONING & PERFORMANCE TESTING OF THE PLANT AT ROSPER ROAD, SOUTH KILLIGHOLME, IMMINGHAM
- Geotechnical Interpretative Report (GIR)
- Geotechnical Design Report (GDR) on the foundation of the Power Train (i.e. GT, Generator, Air Intake, Diffuser, Stack, Enclosures) of the Project
- Geotechnical Design Report (GDR) on the foundation of the Generator Step-Up T/F of the Project
- Geotechnical Design Report (GDR) on the foundation of the Fire Fighting Tank of the Project
- Piling Mat Design to be placed along the areas of the site where rigid inclusions are envisaged for construction
- Quidelines on the backfilling procedures to be followed with respect to levelling the site at certain working elevations